Bryce’s Studio Diary, Part 8

On Wednesday, the flooring was installed, which meant that at last, I could start moving things in, starting with the sofa. On Thursday, the desk arrived, which was a few days sooner than I was expecting, so by the end of the week, things looked like this:

On Friday, I put up the curtains. With all the rain, everything outside is mud, so the more I worked, the more mud got into the studio.

And today, after many weeks of waiting and many decades of looking forward to having my own studio space, I moved all the gear in, including setting up the V-Drums in a left-handed configuration. I’ve always only ever sat down at right handed drum kits, so now I’ll have a chance to properly practice. But I will still need to flip things around if anyone else wants to play.

Still a bit of work to, still some fittings to come, but overall, we are nearly set up and ready to go!